References · Reference

PPP Pipeline Status Reports as at December 2024, PPP Directorate, National Treasury, January 2025.

PPP Pipeline Status Reports as at December 2024, PPP Directorate, National Treasury, January 2025.

Contributed by Jay. Approved by Jay on 23 October 2026, from revision 467 of the article “Mombasa Electric Ferry and Water Transport System”.
Ask the Librarian